Malaysia
Single Source Formwork Solutions for Multi-Tower Project
In the government district of Putrajaya, a new administration building of the Malaysian Anti-Corruption Commission is under construction by Mitrajaya Holdings Berhad.
In Malaysia, the architecture of the elevated buildings has a very long tradition in eliminating specific situations. Buildings are usually designed to keep out wild animals or prevent flooding of living rooms and bedrooms. In addition they have to withstand extreme winds and heavy rain.
In the government district of Putrayjaya, this construction method provides the high-rise complex with an extraordinary architectural design.
The first 30 floors of the three building complexes are elevated on delicate inclined supports.
A massive intermediate level appears to hover at a height of 40 m. In addition to the special architecture, the ambitious construction schedule provided a special challenge.
For constructing the complex elevated high-rise areas, the contractors are working with Peri for planning and delivery of the formwork and scaffolding solution from a single source.
The systems used were perfectly matched to one another resulting in a safe and time-saving execution.
Comprehensive service from one source
Peri engineers planned and delivered the overall concept of the wall, slab and climbing formwork through to the appropriate form lining for the required concrete surfaces.
A particularly important role in the project-specific planning services was played by the spatial working scaffold and shoring solution which was based on the PERI UP modular scaffold system.
continued >>>